Pitch Heating Services
If your pitch heating system is struggling to maintain consistent surface temperatures, experiencing frequent failures, or showing signs of reduced efficiency, it may be time to consider a system upgrade or replacement.
For over 5 years Combust BSL have worked with Pitch Heating Limited to service under-pitch heating systems of football stadia across the UK. Our comprehensive service of each plantroom ensures optimal operations and minimises the risk of failure.

Why Choose Combust BSL?
Benefits of Weishaupt Burners
A brand you can trust
More than ever stadiums are relying on the world leading Weishaupt burner to run with the latest controls and technologies.
Not only do you benefit from high quality German engineering, but no brand provides better spares availability than Weishaupt. No more waiting on long lead times for parts from other manufacturers as we can get any component within 24 hours.
Recent Work
What’s included in our Pitch Heating Service?
Burner
-
Burner dismantled for service and inspection.
-
Air damper assembly cleaned,
-
Inner gas assembly removed, cleaned, and inspected.
-
Diffuser plate cleaned.
-
Ignition probe and cable cleaned and inspected
-
Flame sensor viewing screen cleaned.
-
Burner fan wheel cleaned and inspected
-
Combustion gases analysed and optimised both high and low fire
-
Flame failure simulated proving burner lockout.
-
Air pressure failure lockout simulated.
-
All fixing bolts/pins lubricated.
-
All Safety controls tested and set accordingly.
-
Burner flame tube in good condition.
-
Gas tightness test of gas train carried out (50mb) following removal to open the boiler door, proving the gas train to be gas tight.
Boiler
-
Boiler door opened and the internal side inspected.
-
Boiler door ceramic inspected
-
Cavity between the burner flame tube and boiler door refractory correctly packed with ceramic fibre.
-
Boiler tube heat retarders removed so that the boiler tubes could be cleaned with rotary tube brushes to optimise boiler efficiency.
-
Firing chamber cleaned to optimise boiler efficiency.
-
Boiler tube front plate cleaned to optimise boiler efficiency.
-
Boiler door seal replaced.
-
Rear boiler firebox inspection plate removed, and all scale/debris removed.
-
Rear firebox ladder tape condition?
-
Boiler High/Low thermostat tested and set to required temperature.
-
Boiler control thermostat tested and set to required temperature.
Expansion tank
Visual check
3-Port mortised valve
-
Visual condition
-
Manual override switch in working order
-
Manual operation check
-
Automatic operation tested and correct
Boiler shunt Pump
-
Operating correctly with no leaks
-
Mechanical wear
Circulating pumps
-
Pump 1 tested and operating correctly: Mechanical wear
-
Directional check
-
Inverter or DOL
Control Panel
-
Internal condition of Control cabinet
-
External condition of control cabinet
Interested in learning more about our Pitch Heating Services? Contact us using the form below.
Provide your details below and we'll contact you back to create a bespoke quote.